Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Tree Removal topic
No spam. Unsubscribe anytime.
Homeowner gets approval to remove dead and hazardous trees at Pheasantwood Drive; replacement required for large trees
Summary
The commission approved a homeowner's request to remove multiple trees (including several dead pines) at 7 Pheasantwood Drive, requiring replacement plantings for trees over 4 inches DBH and standard erosion controls; one commissioner abstained due to neighbor status.
Get email alerts on the Tree Removal topic
No spam. Unsubscribe anytime.
Homeowner Bill Ryan asked the Wakefield Conservation Commission on July 7 for permission to remove several trees at 7 Pheasantwood Drive, saying a line of pines adjacent to his house included multiple dead trees and at least one large pine close to the foundation that posed a hazard. "I have various trees on my property... I have kind of a complex situation," Ryan said while showing a site map and video of the yard.
Staff and commissioners discussed measurements, wetland buffers and access for tree contractors. The commission chair noted the town's tree bylaw requires replacement for trees over 4 inches in diameter at breast height. Ethan, the conservation agent, and commissioners recommended erosion controls and suggested native shrubs (spicebush) as replacement options in shaded areas that receive little sunlight.
Commissioner Drew moved to approve the removals shown on the plan, with replacement consistent with the bylaw; the motion was seconded by Barbara and passed. The vote record: Eleanor — yes; Jennifer — abstain (neighbor); Barbara — yes; Drew — yes; Chair Paul — yes. Ethan said he will prepare a written approval letter for Ryan to give contractors. Ryan said he would send photos and documents to staff for the file.
The approval applies to the specific trees identified in the plan; the commission emphasized that trees over 4 inches DBH must be replaced in a manner consistent with the bylaw and that erosion-control measures should be discussed with contractors before work begins.

