Summary
The Planning Commission voted July 9 to continue consideration of PL2026-078, a proposed 8,000-square-foot convenience store with fuel pumps and a 2,000-square-foot restaurant on an 11-acre site at US-50 and Blackwell Road, after residents voiced safety and drainage concerns and commissioners requested a single preferred elevation, canopy design and pedestrian connectivity plans.
Get email alerts on the Land Use topic
No spam. Unsubscribe anytime.
The Lee's Summit Planning Commission on July 9 continued a preliminary development plan for a proposed convenience store, fuel canopy and drive-through at the northeast quadrant of US-50 and Blackwell Road to an August 27 hearing, after lengthy staff presentation, applicant testimony, commissioner questions and sustained public comment.
The motion to continue, made by a commissioner during the meeting, passed on a 5–3 roll-call vote (Molly Pesch, Terry Trafton, Chip Tesinski, Jessica Grunau and Lee Moore voting yes; Peyton Hatcher, Dana Arth and Tanya Johnaford voting no). The continuance gives the applicant time to provide detailed canopy and elevation drawings, a single preferred building elevation rather than alternate options, pedestrian-circulation details and refined parking/impervious coverage plans.
Why it matters: neighbors and several commissioners said the site sits on a gateway corridor into Lee's Summit and requires tighter design detail to protect adjacent residential neighborhoods. Residents raised concerns about increased traffic and pedestrian safety around multiple roundabouts, the capacity and location of stormwater detention, nighttime canopy lighting and the overall fit of a highway-oriented use adjacent to established single-family neighborhoods.
What the commission heard - Applicant presentation: Civil engineer Matt Smith, representing the applicant, described the portion of the site before the commission as the east half of a larger 10–11 acre parent parcel and said, “Currently, we are only going to be designing and developing the middle road and the east portion of the site.” He outlined grading, proposed temporary swales and a stormwater approach using the TR-55 hydrologic methodology to avoid increased post-development peak flows. Architect Vincent Foster presented two façade options: a preferred sloped (shed) roof and an alternate flatter roof, and detailed a material palette including Nichiha fiber-cement panels and stone wainscot. The plan includes a 6,000-square-foot convenience store and a 2,000-square-foot leasable space intended for a restaurant.
- Staff analysis: Senior planner Hector Soto Jr. told commissioners staff supports the requested modification to the clear-glass fenestration requirement on the east elevation given the site's corner configuration, and summarized staff-recommended conditions including compliance with the development plan and construction of required road improvements (the proposed J Road and a right-in/right-out access). Soto also confirmed the city has received one formal protest petition and several other resident comments.
- Resident concerns: Several nearby residents urged denial or further study. Jackie Huff, who lives adjacent to the neighborhood, said, “I want to make sure that the runoff would work properly,” and asked commissioners to deny the application because she believed stormwater and traffic issues were not yet addressed. Neighbor Narendra Jogi told the commission the proposed northern exit would affect Canterbury Lane residents and raised pedestrian-safety and noise concerns. Other speakers cited light trespass from fuel-canopy illumination, fuel-tanker access through roundabouts and potential impacts to property values.
- Staff responses: Engineering staff and the city's development engineering manager (Sue Powell) said the preliminary stormwater report indicates there is space for detention basins and that detailed, final stormwater calculations and routing will be reviewed and must meet city specifications at the final development stage. Staff also said the submitted site-lighting plan conforms to ordinance limits, with proposed zero-footcandle boundaries shown in the packet. Traffic staff explained the interchange and roundabouts include truck aprons to accommodate larger vehicles and noted Missouri Department of Transportation (MoDOT) constraints on direct Blackwell access between roundabouts.
Commission direction and next steps Commissioners coalesced around a set of required clarifications for the applicant before the next hearing: adopt a single preferred building elevation, provide detailed canopy and signage drawings that match building materials, show pedestrian circulation and crosswalks between the convenience store and future on-site commercial buildings, produce an efficient parking plan (the current preliminary layout shows approximately 110 spaces with a stated requirement of 79 for the proposed uses), and finalize stormwater detention layout and calculations for review in the final development plan. The commission also requested evidence that the applicant will address the wooded buffer and trash-enclosure visibility to reduce impacts on adjacent homes.
The commission will hear PL2026-078 again on August 27; staff and applicants may return with updated plans and any required revisions. If commissioners recommend approval or denial after that hearing, the matter would then move to City Council for final action.
Notes from the record: the application identifies the applicant as KDP Hospitality LLC and shows a pump island with 10 double-sided pumps (20 fueling positions) and conceptual additional commercial buildings on the parent parcel. Staff noted one protest petition had been filed and that notice was mailed to property owners within the city's 300-foot notification radius.
The commission adjourned after roundtable discussion on bylaw review and public-notice procedures.