District approves sampler pump replacement, software flushing upgrade and awning repair at lift station

Hoover Sanitary Stormwater District · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized a warranty-contingent purchase for a sampler booster pump, approved a $13,680 one-time software/hardware upgrade for force-main flushing, and approved up to $1,979 to repair a damaged lift station awning.

Lift-station staff reported several maintenance needs and the board approved procurement actions for three items: a replacement booster pump for a sanitary sampler, a programming upgrade to automate force-main flushing, and repair of a storm-damaged awning.

The lift-station operator (voice 5) said the existing sampler pump is failing and presented a quote for a replacement at $3,781; the board approved the purchase contingent on confirmation of a warranty. Staff then described a Poshgen Electric upgrade to the HMI and flushing controls for a 30-inch force main that would let operations run flush sequences at selected hours and durations; the one-time cost reported in the packet was $13,680 and the board approved the upgrade by voice vote.

Separately, the board approved a not-to-exceed $1,979 repair to replace awning frame and fabric at the main lift station after storm damage; staff noted a lower quote ($1,660) might apply if the frame is undamaged but sought authorization for the higher amount to ensure funds are available.

Next steps: staff will confirm warranties for the sampler pump, finalize the Poshgen installation and schedule awning repairs as weather and parts permit.