Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Operations topic

No spam. Unsubscribe anytime.

Board approves pump replacement contingent on warranty and upgrades force-main flushing controls

Hobart City Redevelopment Authority Meeting · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Board approved a conditional purchase of a replacement sampler booster pump contingent on warranty confirmation and approved a $13,680 force-main flushing upgrade to add programmable flushing control for a 30-inch force main.

Operations staff told the board a sampler booster pump at the main lift station has failed and the vendor quote is $3,781. Members asked about a warranty; the board approved the purchase contingent on demonstration of a warranty period.

Separately, staff presented a one-time software/hardware upgrade proposal to add programmable control and an HMI interface to the 30-inch force-main flushing system, enabling the city to schedule and modify flushing—particularly at low-flow hours—to reduce odors and improve performance. The quoted cost discussed in the packet was $13,680 and the board authorized the modification.

Board members questioned remote access and cybersecurity safeguards for any vendor remote-control capability; staff noted remote access could be considered later but emphasized the immediate benefit of programmable flushing to address recurring odor and low-flow issues. The approvals were made by voice vote; each action directs staff to finalize procurement consistent with the stated conditions.