Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Agriculture topic

No spam. Unsubscribe anytime.

Planning Board approves special permits for expanded boarding stable at 145 Broad Brook with performance bond and screening conditions

Bedford Planning Board · July 13, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board granted special permits and an amendment to allow a consolidated 20‑stall barn and commercial boarding operation at 145 Broad Brook, subject to ZBA conditions, town engineer requirements, a performance bond, and continued compliance with prior planting/screening obligations.

The Planning Board approved special permits authorizing a consolidated 20‑stall barn, associated farm buildings and up to 24 horses at 145 Broad Brook after the Zoning Board granted needed variances and the applicant agreed to conditions addressing screening, drainage and a performance bond.

Attorney Jamie Splane and property representatives described a plan to remove several piecemeal barns and construct one centralized barn and supportive shed rows, add an outdoor paddock and an access gate to centralize operations and improve safety. The applicant acknowledged a neighbor’s letter about a prior planting plan and said the owners will comply with any outstanding conditions from earlier approvals.

The town engineer reviewed SWPPP material and offered comments; board members said those engineering items can be resolved in the permitting process and included a performance bond as part of the conditions. Screening along the property line must be preserved or replaced if trees fail; the applicant agreed to plant screening on its property if neighbor trees fall.

The board’s motion incorporated zoning board conditions, engineer requirements for fill and grading, and the performance bond; the special permits and amendment were approved by voice vote.