Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use Site Plan topic

No spam. Unsubscribe anytime.

Planning Board approves site plan for new home at 5215 Tummonds Road, with conditions

Town of Walworth Planning Board · May 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Town of Walworth Planning Board on May 11 approved a site plan for a one‑story, three‑bedroom house at 5215 Tummonds Road, requiring the applicant to address MRB Group engineer comments, secure easements and necessary permits, and satisfy town code security provisions.

The Town of Walworth Planning Board voted May 11 to approve a site plan allowing construction of a one‑story, three‑bedroom single‑family home at or about 5215 Tummonds Road.

The board’s resolution, adopted unanimously by roll call, approves the application filed by Glenn and Ann Mattison but makes the approval conditional on several items, including addressing all outstanding town comments and the May 5, 2026 engineer letter from MRB Group; providing any necessary easements for public improvements or utilities; completing any required utility districting to the Town Board's satisfaction; obtaining permits and approvals from other governmental agencies; and complying with Town Code Section 151‑19 on security requirements.

Applicant Glenn Mattison told the board he intends to downsize to a three‑bedroom, one‑story home and said the project is in compliance with required setbacks according to the town engineer. Mattison provided a paper map showing the existing house and the proposed new house; the map was accepted into the town record.

The board’s written resolution references the proposed site plan drawn by Land Tech titled “Tummonds Road Town Lot 57” and states the application is a Type II action under SEQRA. The resolution records that outstanding comments from MRB Group (engineer) and the Town Code Enforcement Officer must be satisfied to the satisfaction of those officials before final implementation.

Patricia Marini moved to approve the resolution with conditions; Doug Flye seconded. The roll call recorded Chairperson Landry, Lou Villanova, Doug Flye and Patricia Marini voting aye and the motion carried.

Next steps: the applicant must address the engineer’s comments and other town requirements specified in the resolution before work proceeds or permits are issued.