Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Operations topic

No spam. Unsubscribe anytime.

Deputy Director Teresa reports on treatment-plant odor tests, PFAS lab search and service-line outreach

Water Pollution Control Authority (WPCA) · February 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Deputy Director Teresa briefed the WPCA on taste-and-odor issues at the Charles Bacon treatment plant, pilot jar testing with powder activated carbon and hydrogen peroxide (estimated $20,000 for full-scale testing), and an effort to reduce unknown service-line locations from 1,100 to 728.

Deputy Director Teresa told the board the department is addressing recurring taste-and-odor problems at the Charles Bacon water treatment plant and has been conducting jar testing using powder activated carbon and hydrogen peroxide. "It would cost us approximately $20,000 to put this into effect," Teresa said about a full-scale pilot she is seeking to implement pending regulatory review.

Teresa said the department has asked the Department of Public Health for a full-scale study of the powder-activated-carbon plus hydrogen-peroxide approach and will ensure chemical types and compliance before wider use. She also noted the team is searching for a Connecticut-certified lab that can handle perfluorinated compound (PFAS) testing; if the laboratory is secured and additional quarters show no target compounds, the district could request a waiver that would push out testing requirements and save time and money.

On infrastructure, Teresa reported the service-line outreach effort reduced unknown-service-line locations from about 1,100 to 728 and that staff will continue contacting property owners; the next step would be field excavations if access is not obtained. Chief Engineer Brian added status updates on water-main and pump-station projects, work with contractors to seal manholes and reduce groundwater inflow, and upcoming water-main bids timed for the spring and summer construction season.

No regulatory enforcement actions or emergency public-health orders were announced at this meeting; staff said they will return with study results, contractor schedules, and any regulatory findings at future WPCA meetings.