Applicants revive 2013 plan for two dwellings at 370 Shaw Street; board requests stormwater peer review

Town of Braintree Planning Board · July 14, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A family owner and engineers asked to build two dwellings with attached garages at 370 Shaw Street; the board agreed to continue to Aug. 18 so DPW comments and a stormwater peer review can be addressed.

Jackson Griffiths, project engineer with Hardy Mann Design Group, presented a revised site plan for 370 Shaw Street on July 14, explaining the application reuses a plan approved by the planning board in 2013 but never built. The current submission shows two new dwellings (building A footprint ~2,000 sq ft; building B ~1,380 sq ft) with attached garages, a 20‑foot access driveway and retention/infiltration systems sized to capture roof and driveway runoff.

Owner Bill Jablonski told the board financing problems prevented earlier construction; the family now seeks to proceed with updated drainage and grading. Griffiths described a Koltec infiltration system, trench drains, retaining walls and driveways designed to meet fire‑truck turnaround requirements.

Why it matters: the board noted the site’s previous approval contained more asphalt and higher retaining walls; staff and DPW want a peer review to confirm the new leaching chamber design, verify slope and drainage and ensure winter icing risks associated with a 12% driveway grade are mitigated.

Board action: staff and DPW flagged only minor design items but recommended a stormwater peer review. The applicant agreed to revise plans to address DPW comments; the board continued the hearing to August 18, 2026, to allow time for peer review results and updated plans.

Next steps: applicant to respond to DPW comments and return with updated stormwater calculations; staff to obtain a peer‑review estimate and circulate comments prior to the August 18 meeting.