Zoning board approves 13-foot setback variance for warehouse at 175 Industrial Park Road

Middletown Zoning Board of Appeals · April 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Middletown Zoning Board granted a variance to 175 KSR LLC to build a 2,800-square-foot warehouse that encroaches 13 feet into the 75-foot front-yard setback, citing topographical constraints and wetlands that limit buildable area; staff noted a site plan will be required.

The Middletown Zoning Board of Appeals voted to approve a variance allowing a 2,800-square-foot standalone warehouse to encroach 13 feet into the 75-foot front‑yard setback at 175 Industrial Park Road.

Applicant representative George Waugh told the board the property's wetlands and watercourses significantly reduce usable land and that Connecticut law supports granting a variance where topography creates a hardship: "The topography of his site requires the variance," Waugh said, arguing that the narrow encroachment (about 17 percent of the 75-foot setback) is minimal and does not alter the industrial nature of the neighborhood.

Owner (identified in the record) described site constraints that would make moving the building back impractical, including existing parking, drainage patterns and sanitary easements. Town staff confirmed the road's wide right-of-way makes the effective distance from the curb to the proposed building larger than the setback measured from the property line and described the 13-foot reduction as "fairly insignificant."

After closing the public hearing with no speakers, a board member moved to approve the variance; the motion carried. Staff advised the applicant that a site plan filing will be required before zoning approval is final.

What happens next: Applicant must submit a site plan for review and any additional permitting required by town departments.