Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Setback Variance topic

No spam. Unsubscribe anytime.

Mahwah board approves setback variance for garage addition at 29 State Street

Township of Mahwah Board of Adjustment · May 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a public hearing, the Township of Mahwah Board of Adjustment approved a "C" variance allowing Drew Kreismer to extend an attached one-car garage by about 10 feet to store three vehicles; the board recorded a 5-0 roll-call vote in favor.

After a public hearing and work-session discussion on May 20, the Township of Mahwah Board of Adjustment approved a "C" variance allowing homeowner Drew Kreismer to add roughly 10 feet to the rear of an existing attached one-car garage at 29 State Street, the board minutes show. The addition would increase a side-yard setback from the current 8.9 feet to a proposed 9.3 feet where a 12-foot setback is required.

Attorney Ari Bernstein represented the applicant; Mr. Kreismer was sworn and described the proposal as intended to provide space to store three vehicles. The applicant entered Exhibit A-1 into the record: five color photographs taken by the homeowner to illustrate the property's current appearance and the proposed work. Board members asked technical questions about the garage door dimensions and whether the concrete patio would be extended; Mr. Kreismer confirmed the patio would not be extended.

During the work session, Mr. Calijone asked whether there would be heat or electric that could create additional living space; Mr. Kreismer said no living space would be created and noted existing radiant floor heat. Mr. Taylor said the impact was "fairly de minimis" and asserted a hardship exists; Mr. Molfetta said the property is well maintained and supported approval. A motion to approve the application was made by Mr. Molfetta and seconded by Mr. Kasparian; a roll-call vote recorded five aye votes by Mr. Calijone, Mr. Kasparian, Mr. Lockwood, Mr. Molfetta and Mr. Taylor.

The board closed the hearing, approved the variance in the work session, and adjourned at 7:56 p.m. The minutes and supporting materials were provided to the board for approval at the June 3, 2026 regular meeting.