Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facilities topic

No spam. Unsubscribe anytime.

Board hears repeated vandalism at Central School; staff outlines repair costs and closure

School Board of Trustees · June 23, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff reported multiple intentional breakings of gym-quality glass backboards at Central School, closed the playground until repairs, and presented vendor quotes including $1,600–$1,800 per backboard, $5,444 for playground gravel and $4,620 to replace sidewalk sections.

District staff told the board that Central School has suffered repeated vandalism in which rocks shattered gym-quality glass backboards, prompting a temporary playground closure for safety and repairs.

A staff member said this was the third incident in two years at Central and that replacements cost roughly $1,600 to $1,800 each. "The playground is currently closed until further notice because we don't want anybody over there until we get that board removed," staff said. Staff reported reviewing video to identify possible student suspects and discussed parent outreach and referral to law enforcement as options.

Staff also presented vendor quotes for additional repairs: installing new playground gravel (recommended depth two to three inches) at an estimated $5,444 and removing and replacing eight broken sidewalk sections on the building’s northeast side at an estimated $4,620.

Board members discussed options to reduce recurring replacement costs, including ordering custom plexiglass backboards or switching to metal hoops. Staff noted the original backboards were donated and that community fundraising had helped pay for earlier installations. No formal procurement decision was made at the meeting; staff recommended evaluating options and returning with recommendations.

The board did not take a formal vote on replacement vendor selection at this meeting; staff will follow up with cost comparisons and recommended scope.