Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Sewer Utility topic

No spam. Unsubscribe anytime.

DNR inspects Port Wing sewer plant; board to review receipts and consider rate increase

Port Wing Town Board · October 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Town crew reported a DNR inspection of the sewer plant and a planned review of dumping receipts; the board said it will obtain a Bayfield County report and consider whether sewer rates need to be raised.

Town crew member Troy Kavajecz told the Port Wing Town Board on Oct. 14 that the DNR inspected the sewer plant and that Benson Electric will perform a conduit repair at the facility.

Minutes note that docks have been removed and that the town needs to obtain a report from Bayfield County and review dumping receipts. The board agreed it must review whether sewer rates should be increased, though no proposed new rate or timetable was provided in the minutes.

No formal action to change rates or to authorize specific repairs was taken at the meeting; the board directed staff to gather the county report and related financial records for further consideration.