Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Change Of Use topic

No spam. Unsubscribe anytime.

Planning Board gives conditional OK to walk‑up ice‑cream stand at 71 Plaistow Road

Plaistow Planning Board · July 16, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board conditionally approved a change of use at 71 Plaistow Road to allow a walk‑up ice‑cream stand and retained office space above, imposing conditions for NH DOT driveway permit, MUTCD‑compliant striping and code‑compliant lighting and standard final plan stamps.

The Planning Board on July 15 conditionally approved an amended site plan to convert part of a two‑story office building at 71 Plaistow Road into a walk‑up ice‑cream stand while preserving office space on the second floor.

Applicant Steven (Steve) Corey told the board the proposal keeps the existing septic system and adds four serving windows; he said an open foundation on the property is fenced and screened and that he will add a wooden facade and additional lighting. Board members and consultants pressed for clear pedestrian circulation (striping), parking layout and modest site lighting to make access safe for customers. One board member suggested painted crosswalks and internal signage; the board added code‑compliant lighting requirements.

The board’s conditional approval requires submission of all applicable professional stamps, the NH DOT driveway permit, and final plans reflecting UTC/MUTCD‑compliant striping and code‑compliant lighting; it also noted a $2,921 public‑safety impact fee tied to the addition size should the building size change. The motion passed 5‑0‑0.

The applicant said he intends to operate seasonally into evening hours and to keep the existing fenced foundation closed off to the public. The board asked the building/code official to verify electrical/lighting permits during construction.