Trappe Town Council · September 11, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Trappe Town Council on Sept. 11 voted unanimously to spend $63,400 in ARPA funds to buy a diesel generator and related electrical work to replace a broken propane unit at the town water tower, selecting local Kelly Generator and Bilbrough Electric based on existing service contract and familiarity with town infrastructure.

The Trappe Town Council unanimously approved on Sept. 11 the emergency purchase of a diesel generator and associated electrical work for the town water tower, voting to spend $63,400 in American Rescue Plan Act (ARPA) funds.

President Schmidt called the special meeting to order at 2:00 p.m.; Council members Rose Potter, Jeremy Newnam and Michael Sullivan attended, along with Town Administrator Erin Braband and Water/Wastewater Operator Shawn Lane. Town staff told the council they had contacted five companies for quotes and received multiple bids that morning.

Town staff reported that Kelly Generator quoted a Generac 130 kW unit for $54,500 with delivery in about 6–8 weeks. General Power submitted two options: a Perkins 130 kW at $52,051 plus shipping from Florida with a 12–14 week delivery window, and an in-stock Perkins 150 kW priced at $55,573 plus $2,273 shipping (total $57,846). Bilbrough Electric provided an electrical-work estimate of $8,900 based on the Kelly Generator specifications and noted it would need a separate site visit to quote work to match General Power’s specifications.

Commissioner Jeremy Newnam moved that the town use ARPA funds to approve the emergency purchase as quoted by Kelly Generator and Bilbrough Electric for a total of $63,400, noting that Kelly Generator is a local company, the town already holds a service contract with them, and the firm is familiar with Trappe’s infrastructure. Commissioner Michael Sullivan seconded the motion; the vote was unanimous.

The motion formalized approval of the equipment purchase and the electrical work estimates identified by staff. The council then adjourned at 2:38 p.m.; Erin Braband, town administrator, submitted the meeting minutes.

The town record does not specify additional procedural steps or a delivery schedule beyond vendor quotes. Bilbrough Electric had indicated it would perform a further site visit if General Power’s specifications were pursued, but the adopted motion selected the Kelly Generator-based plan.