Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Erosion Sediment Control topic

No spam. Unsubscribe anytime.

Planning Board directs staff to confirm compliance for erosion control at 20 Jennifer Rose Way

Town of Newburgh Planning Board · November 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board directed MHE to prepare a memo to the Building Department confirming that a proposed erosion- and sediment-control plan will put the 20 Jennifer Rose Way project into compliance in the Chadwick Lake watershed once implemented.

The Planning Board on Nov. 6 heard a short staff report on an erosion- and sediment-control review for a single-family residence at 20 Jennifer Rose Way in the Town's critical environmental area (Chadwick Lake watershed).

Pat Hines of MHE said the project is minor, does not exceed lot-coverage limits and requires a Planning Board review letter confirming compliance when an erosion- and sediment-control plan is implemented; his office will coordinate with the Building Department on the technical review. John Ward moved and Stephanie DeLuca seconded a motion directing Pat Hines to prepare the memo to Code Compliance; the board voted unanimously.