Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Exterior Renovation topic

No spam. Unsubscribe anytime.

Plan Commission approves exterior renovation at 199 S. Lexington by Frey Construction

Spring Green Plan Commission and Downtown Design Committee · July 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Spring Green Plan Commission and Downtown Design Committee unanimously approved an exterior renovation/remodeling application from Frey Construction for 199 S. Lexington Street during the June 17, 2026 meeting, following committee review.

The Spring Green Plan Commission and Downtown Design Committee on June 17, 2026, unanimously approved an exterior renovation and remodeling project at 199 S. Lexington Street proposed by Frey Construction.

After the committee reviewed the application submitted by Josh Reddemann of Frey Construction, Plan Commission member Robin Reid moved to approve the exterior renovation; Kevin Zimmer seconded. The motion passed with all members in attendance voting in favor (David Saperstein, Tyler Wilkinson, Robin Reid, Jenafer Humphries, Kevin Zimmer, Ed Lilla and Brad Hutnik).

The minutes record no public comment on the proposal and do not specify conditions or required follow-up deliverables; specific design details and any required building permits were not included in the minutes provided.