Town reports progress at wastewater plant after sludge press rental removed about 1,000 tons
Summary
Town staff reported that a rented sludge press removed roughly 1,000 tons of accumulated sludge from the wastewater plant, expected nitrogen reductions this week, and a plan to hardwire backup telemetry after a switchgear failure interrupted operations.
Get email alerts on the Wastewater Operations topic
No spam. Unsubscribe anytime.
Town staff reported operational improvements at the Colonial Beach wastewater treatment plant and outlined recent problems and fixes. A rented sludge press has removed approximately 1,000 tons of excess sludge and rental operations will conclude in about a week and a half. Staff said they expect to see nitrogen levels drop "drastically" beginning this week and to show a downward trend in next month's report.
The plant experienced a significant power failure at the headworks caused by a switchgear failure; parts took about two weeks to obtain and the equipment has been restored. Staff reported intermittent telemetry and backup-system issues and described a plan to hardwire critical telemetry to reduce reliance on remote telemetry and prevent similar outages. "We've taken right at 1,000 tons of excess sludge out of that plant," the staff presenter said, calling the effort "a tremendous amount of sludge built up in the plant."
Staff also noted the wastewater team's expectation to bring some process tanks back online as sludge removal and repairs continue. The town manager said the next staff report will include details about a recent rain event and its operational impacts. No formal council action was taken; this was an informational operational update.