Commission urges preservation measures after conditional-use hearings for 1485 Valley Forge Rd
Summary
At its April 20 meeting the Schuylkill Township Historical Commission discussed conditional-use hearings for 1485 Valley Forge Rd, backing stabilization of an 1834 barn and urging conditions that could preserve an adjacent barnyard wall if it proves contemporaneous.
Get email alerts on the Historic Preservation topic
No spam. Unsubscribe anytime.
Michael Gill, commission counsel, updated the Schuylkill Township Historical Commission on recent conditional-use hearings for 1485 Valley Forge Road, where an application initially sought demolition of an 1834 barn and a tenant house. Gill said the applicant amended the proposal after a site visit that revealed a burst pipe and interior flooding in a non-historic section; the applicant removed the barn demolition from the application and now seeks only demolition of the tenant house.
Robert Wise, the commission's historical consultant, and Gill attended the hearings and toured the property with the applicant's representatives. Gill told the commission that preserving the barn would allow immediate stabilization work, while a full denial could block timely efforts to protect the structure. The consultant noted that non-historic parts of the barn could be removed if their removal does not harm structural integrity; he also suggested the forebay could be removed if stability is not affected.
A central question for the commission is whether the nearby barnyard wall is contemporaneous with the 1834 barn. Robert Wise said he was prepared to press the wall's retention before the Supervisors; Peter Levin said that if the wall dates from the same era as the barn it should remain and might enhance future uses. The commission expressed a preference to preserve the wall if historical evidence shows it is the same age as the barn, while acknowledging the applicant's site plan constraints could limit that possibility.
Commissioners discussed proposed conditions of approval intended to require immediate protective steps upon closing rather than waiting for full build-out. Gill said the minimal required action might be to "wrap" the building envelope after interior remediation, and that the commission will insist utilities be installed to the barn. Gill plans to submit the commission's draft conditions to the applicant's attorney and to argue the commission supports the builder's application with those conditions. May 1 is the deadline for all parties to file proposed findings and conclusions of law.
No formal vote on those conditions is recorded in the minutes; the record shows the commission discussed and supported pushing for stabilization and protective conditions as part of the conditional-use proceedings. The commission will continue to monitor filings and the Supervisors' rulings on the application.