Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the 84 Washington Coa topic
No spam. Unsubscribe anytime.
Westwood HPC approves response to 84 Washington COA and accepts February minutes
Summary
At its March 19 meeting the Westwood Historic Preservation Commission approved a response letter on the Certificate of Appropriateness for a planned subdivision at 84 Washington (to renovate into a three-family dwelling), accepted February minutes, and adjourned at 7:51 p.m.
Get email alerts on the 84 Washington Coa topic
No spam. Unsubscribe anytime.
The Westwood Historic Preservation Commission on March 19 approved a response to a Certificate of Appropriateness (COA) for 84 Washington, where a new owner plans a subdivision and renovation to a three-family residential dwelling.
A response letter drafted by Lou Scheideler was read and reviewed by commission members. Bill Haffler moved to accept the response letter with a correction to item No. 2 (changing a word to "practicable"); Ann Costello seconded. The motion passed with five members recorded as voting in favor (Rachel Berkoben, Mike Bieri, Noeline Grefrath, Jackie Martin, Christine Scheideler). The minutes record Steve Lydon as absent and Lou Scheideler as excused.
Earlier in the meeting Christine Scheideler submitted the February 2026 minutes; Ann Costello moved to accept the minutes, seconded by Rachel Berkoben. The minutes motion was recorded as passed and Christine Scheideler was directed to forward the approved minutes to the borough clerk for posting on the borough website.
The meeting concluded with a motion to adjourn by Mike Bieri, seconded by R. Berkoben; the motion carried and the commission adjourned at 7:51 p.m. The next meeting is scheduled for April 16, 2026, at 7:00 p.m. in Westwood Borough Hall, second floor.
