At a July 13 Planning Board public hearing, Newhouse Wildlife Rescue described plans to relocate to 1090 North Road and detailed enclosures, parking and operations; neighbors raised sustained concerns about traffic and safety on North Road while the board requested more documentation and said the hearing will continue.

The Carlisle Planning Board on Monday heard a detailed site‑plan presentation from Newhouse Wildlife Rescue and hours of questions from board members and residents about traffic, safety and long‑term oversight.

Attorney Melissa Robbins, representing the applicant, said Newhouse seeks to convert the residential property at 1090 North Road into a wildlife rescue and education center on about 13.1 acres. Robbins said the nonprofit is self‑funded, oversees student interns and focuses on public education and returning animals to the wild: “Right now, I think as of today, when I peaked, we have, 471,000 active members in our Facebook page,” Robbins told the board, citing the group’s online outreach as part of its education work.

Casey Ferrero, the project civil engineer, walked the board through the site layout and proposed outdoor components, saying the plan shows 11 small outdoor rehabilitation enclosures (most roughly 100–394 square feet), a larger aviary (about a 30‑foot diameter), and a small utility shed. Ferrero said applicants do not plan large earthwork, will use permeable materials to reduce impervious area and have located enclosures away from the road with screening and a two‑tier fence to minimize visibility.

Ferrero also described the project’s approach to traffic and trips. Because standard trip‑generation tables do not cover wildlife rehabilitation, the team said it modeled current operations and provided a conservative maximum: “we stated approximately 30 trips would be our maximum average daily,” Ferrero said, adding that peak season (roughly March–August) drives the high estimate.

Board members pressed applicants on several technical and operational points. The board asked how far animals would be returned after rehabilitation (applicants cited a typical five‑mile perimeter guideline), how often the facility receives drop‑offs, details of enclosure construction on steep slopes, stormwater and parking geometry, and how an on‑site manager would be staffed. Applicants said they will keep a manager on site and provide additional materials — including detailed enclosure specifications, turning‑radius illustrations and an emergency response protocol — before the next hearing date.

Public comment reflected deep local engagement. Neighbors and residents offered both support for Newhouse’s mission and urgent warnings about road safety. Rashid Ben Kai, a nearby resident, told the board the neighborhood’s narrow, curving North Road already presents hazards: “There’s a very dangerous combination of two things, narrow road and blind curves,” he said, urging the board to consider measured traffic counts and safety mitigations.

Other residents echoed concerns about winter ice and emergency access, the size of delivery vehicles, and the prospect that a growing online following could increase visitation pressure over time. Several speakers urged objective, documented reporting and suggested conditions that would ensure the facility’s educational use remains primary under the state Dover amendment framework.

The board did not vote on the Newhouse application and left the public hearing open. The chair and staff said the building inspector and town counsel will review whether the proposed use satisfies Dover amendment criteria and that applicants should return with more detailed engineering, operational and reporting commitments. The hearing will continue at a later date.

What’s next

The Planning Board continues the public hearing to allow the applicant time to supply the requested technical plans and to give town officials time to confirm the project’s status under the Dover amendment. For now, the board requested additional documentation on enclosure specifications, parking/turning diagrams, a written emergency response protocol for an accidental release, and a clearer reporting mechanism to demonstrate the project’s ongoing educational activities.