Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Council hires Baldwin for blacktop surveys and advances street improvement plans

Culbertson Town Council · July 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Culbertson Town Council approved hiring Engineer Baldwin for a $300 street-survey fee and passed motions advancing blacktop street regrading, water-main lowering at a highway crossing and related street-improvement work.

Council minutes from early 1959 show repeated steps to advance a program for regrading and blacktopping designated side streets. Engineer Baldwin met with the council and quoted a $300 fee to furnish engineering services to survey and prepare streets for blacktopping; the clerk was directed to advertise and to notify property owners on Highway 16 to register openings for driveways.

In March the council formally voted to hire Mr. Baldwin to make the street survey and approved lowering and replacing a water main at the Highway 16 and Searles Street crossing to meet required depths for paving work. The street committee was tasked with inspecting alleys and streets for gravel and repairs; the town discussed numbering streets as a possible Lions Club project and asked for further consideration on whether name changes were feasible.

These entries indicate the council took procedural and contracting steps—approving an engineering fee, directing notices to property owners, and authorizing physical work on mains—while routine bill payments and budget allocations were handled in standard fashion in each meeting.