Rothschild board approves site plans for Imperial Industries, Incredible Bank and Midwest Motor Condos

Village of Rothschild Village Board · June 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

On June 22 the Village of Rothschild Village Board unanimously approved partial site plans for Imperial Industries and Incredible Bank and both a preliminary plat and Phase 1 site plan for the Midwest Motor Condominiums, attaching conditions on paving, utilities, stormwater and future-phase review.

The Village of Rothschild Village Board on June 22 approved several land‑use applications, including a partial site plan for Imperial Industries, a parking and landscaping plan for Incredible Bank and both a preliminary plat and Phase 1 site plan for the Midwest Motor Condominiums development at 307 Eagle Nest Boulevard.

Zoning Coordinator Rebekka Borchardt told the board Imperial Industries’ application for the two‑acre I‑1 parcel at 202 Industrial Park Avenue includes a roughly 50‑by‑63‑foot gravel turnaround and a security chain‑link fence. Borchardt recommended approval conditioned on compliance with submitted plans and a requirement that the turnaround be paved within two years; the board approved the motion (Stroik/Jablonski) 7–0.

Borchardt said REI’s partial site plan for Incredible Bank at 1130 E. Grand Avenue will reconfigure and repave the lot in two phases to coordinate with upcoming village utility work, add drainage and refresh landscaping. The board approved the plan with conditions requiring screened refuse facilities and the utility updates requested by village engineering staff (Schremp/Kennedy) 7–0.

On a larger industrial parcel, Borchardt presented a preliminary condominium plat and a Phase 1 site plan for Midwest Motor Condominiums, a Planned Unit Development that will ultimately include 15 individually owned motor‑condominium units and one contractor condominium on about 3.25 acres. Phase 1 includes two 1,800‑square‑foot motor condo buildings, a finished demonstration unit to remain with the developer, one shell unit for future sale, associated paving, utilities and construction of the permanent stormwater basin. Borchardt recommended approval with conditions including stabilization and erosion control for disturbed areas, an executed stormwater maintenance agreement, and review and approval of future phases by the Planning & Zoning Commission and the Village Board. The preliminary plat (Kennedy/Schremp) and the Phase 1 site plan (Schremp/Stroik) each passed 7–0.

Each approval was conditioned to preserve village stormwater standards and to require subsequent review of any expanded paved areas or additional phases. The approvals carry next steps to village staff for permit issuance, utility coordination and recorded condominium documents prior to final plats.

Actions recorded: the board passed motions to approve the Imperial Industries partial site plan (motion Stroik/Jablonski, outcome approved 7–0), the Incredible Bank partial site plan (Schremp/Kennedy, approved 7–0), the Midwest Motor Condominiums preliminary plat (Kennedy/Schremp, approved 7–0) and the Midwest Motor Condominiums Phase 1 site plan (Schremp/Stroik, approved 7–0).