Summary

The board approved V-20-24, an after-the-fact variance for a 4,900 sq ft pole barn built without a permit at 1076 Dillon Circle, noting similar nearby structures; the motion passed 7-0. The applicant said the structure was sized to store his RV.

The Planning & Zoning Board approved Jan. 6 an after-the-fact variance (V-20-24) allowing an accessory structure at 1076 Dillon Circle to exceed height and size limits that normally apply to parcels under 2.5 acres.

Staff described the property as just shy of the 2.5-acre exemption threshold and said the pole barn measures about 4,900 square feet and is 22 feet, 8 inches tall—approximately 183% the size of the primary residence on the parcel. That combination triggered review because parcels 2.5 acres or larger are exempt from those particular LDR limits.

The applicant, Brad Marr, told the board he “probably shouldn't have built it without a permit” and said he sized the building to accommodate his camper, which is taller than his house. Staff said the structure will still need building-department inspections and any permit-related fees and noted that an after-the-fact permit application typically carries doubled application fees.

Staff recommended careful review against the five variance criteria, noting the property sits in a relatively rural zoning district where several neighboring lots contain large accessory structures; staff said neighbors had supported the request. The board discussed side-setback concerns and whether approval would set a precedent, and staff reminded the board that each variance is decided on its own facts.

A motion to approve V-20-24 passed on roll call 7-0. The variance clears the way for the building-department review; final building approval remains contingent on the building department’s inspection and any required corrective work or stormwater controls.

Next steps: The applicant must complete the building permit and inspection process; staff noted that engineering review at permitting could require additional stormwater or guttering controls.