The Heritage Pines CDD approved a proposal to clean up an area identified as "33," including optional weed-whacker work, discussed types of mulch and dwindling native grasses at Hole 2, noted a pond-treatment contract with Premier Lakes, and heard one resident ask whether the CDD would support a new building.

At its Dec. 10, 2024 meeting, the Heritage Pines Community Development District approved a grounds-maintenance proposal for an area identified in the record as "33" and discussed related operations and environmental considerations.

District Manager Chuck Adams presented the cleanup proposal, which was requested by Supervisor Carol Vaughan and includes perimeter cleanup, removal of dead trees and mulching. District Engineer Kurt Heath told the board there is a natural wetland in the center of the area and a separate excavated retention area on the western side; the optional scope includes weed-whacker work on a dry retention slope that does not impede drainage. On motion by Michael Walsh, seconded by Stephen Putman, the board approved the proposal, including the optional scope; Adams said the invoice will be paid upon completion.

Supervisor Carol Vaughan asked which is cheaper between mulch and brown-bark wood chips. Tim Gatz, the HPCA grounds superintendent, said wood chips are free and that additional mulching will occur in early spring. Gatz also told the board that native grasses at Hole 2 are dwindling; he will inspect the area and advise whether replacement is warranted.

On financial and environmental operations, Adams reported that Premier Lakes began a new pond-treatment contract on Dec. 1, 2024, treating two ponds and scheduling the next treatments for March and July 2025.

During the non-agenda audience-comments period, a resident asked whether the CDD would consider supporting infrastructure or financing for a new building at Heritage Pines. Adams said the matter has not come before the board and described only a prior brief conceptual conversation with the general manager; Chair Kathleen Lonergan suggested the topic could be discussed at the Feb. 18, 2025 workshop if the board chooses.

The meeting concluded with routine approvals and adjournment at 2:34 p.m.