Wastewater task force outlines $7.3M and $11.2M options for different capacities

Jericho Selectboard · July 16, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Wastewater Task Force presented two cost options for a potential wastewater system: a moderate build (~37,500 gpd) at about $7.3 million serving roughly 153 units, and a higher‑capacity build (~60,500 gpd) at about $11.2 million serving roughly 288 units; consultants await clarifying questions.

Selectboard Chair Erik Johnson summarized July 16 that the Wastewater Task Force has received new cost figures from consultants showing two principal options: a moderate‑capacity system estimated at about $7.3 million (roughly 37,500 gallons per day capacity, serving about 153 units) and a higher‑capacity system estimated at about $11.2 million (roughly 60,500 gallons per day, serving about 288 units). Dubois & King is awaiting the task force’s answers to specific questions before continuing design work.

The task force discussed phasing options to spread costs and capacity over time. Chair Johnson asked that the board review outreach plans: task‑force members and outreach volunteers will present to various town groups and continue targeted conversations with Riverside residents and other stakeholders. No procurement or financing decision was made; the task force requested direction on phasing preferences and continuation of outreach.