Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Playground topic

No spam. Unsubscribe anytime.

St. Luke’s playground redesign wins favorable report after board requests screening and samples

Darien Architectural Review Board · July 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a revised playground plan at St. Luke’s Church that moves play equipment away from the road, reduces the footprint, and proposes 46 black dragon cryptomeria and a mulch strip between a stone wall and vinyl fence; the board asked for color samples and hardware details for the fence.

Darien’s Architectural Review Board issued a favorable report for revisions to the St. Luke’s Church playground at 1864 Boston Post Road after the applicants revised the layout to address safety and streetscape concerns.

Presenters Wilder Gleason (Gleason Associates) and Richard Turlington (Richard Turlington Architects) said the vinyl fence has been moved 6 feet away from the existing stone wall and that 46 black dragon cryptomeria (Japanese black cedar) are proposed between the wall and fence as screening. The playground footprint was reduced and play equipment moved farther from the road; the board requested dark‑grey or black fence samples, black hardware, and that mulch be placed between fence and wall. The plan retains two playgrounds: a smaller one for the youngest children adjacent to the building and the older‑children play area at the existing location.