Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Residential Safety topic

No spam. Unsubscribe anytime.

Building board approves front egress window alteration

Village of Maple Bluff Building Board · March 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The building board approved a 5x5 front egress window to improve basement egress; applicant Gabe said the project will replace existing openings and replant disturbed landscaping.

The Maple Bluff Building Board approved an application to modify a front basement window into a single 5x5 egress window.

Applicant Gabe explained the project would combine two existing openings into a single, safer egress opening to allow for sleeping and occasional use of the basement. He said the work would include regrading and replanting grass disturbed during construction. A board member asked about landscaping around the proposed window well and Gabe said the contractor will replant grass and regrade the area to restore the appearance.

A motion to approve the project as presented was seconded and approved by voice vote; the transcript records the approval but does not include a roll-call tally.