Summary

After reviewing engineering comments and county review requirements, the board granted conditional final approval to a 95-foot monopole (plus 5-foot lightning rod) within a fenced compound with equipment and generator pads; the developer agreed to resubmit county planning documents and post a decommissioning bond.

Applicant representative Pete Albano presented the final land development plan for a telecommunications facility off Airport Road: a 95-foot monopole with a 5-foot lightning rod (100 feet total) within a roughly 45-by-50-foot fenced compound containing two equipment pads and a separate generator pad. Albano told the board the plan reduces the previously proposed fenced area and substitutes a propane generator for the diesel generator shown in earlier approvals.

The township engineer’s review letter was discussed and Albano said the applicant will resubmit to the county planning commission and provide an updated adequacy letter. The applicant also agreed to a tower removal agreement and a decommissioning bond. After clarifications about barbed wire and compliance with the wireless ordinance and engineering review, the board voted to grant conditional final approval with the standard conditions and county review items noted.