Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Water Quality topic
No spam. Unsubscribe anytime.
Sanitary survey flags cross-connection work and emergency chlorination requirement for Three Oaks water system
Summary
Water operator Joe Fender told the committee that the sanitary survey listed several deficiencies; the water tower was inspected July 1, 2025, paperwork will be filed with EGLE, and the village must develop a residential cross-connection inspection plan and an emergency chlorination setup by year-end.
Get email alerts on the Water Quality topic
No spam. Unsubscribe anytime.
Joe Fender, speaking to the committee, said the village received its Sanitary Survey results and is addressing listed deficiencies. "We got our Sanitary Survey results. There are a few deficiencies listed. Most of these were handled prior to getting these results. Others are being addressed," Fender said. He reported the water tower was inspected on July 1, 2025 (last inspected in 2017) and that documentation will be submitted to EGLE in about 4–6 weeks.
Fender said EGLE wants the village to begin residential cross-connection inspections and to establish an emergency chlorination setup that meets regulations and is equipped with a flow meter. "The big part is, EGLE wants us to start doing residential cross connections. That will be tough, because that means trying to get into people’s houses," Fender said. He noted that bacteria tests have been clear for three months and said staff will solicit bids for a chlorination system and finalize inspection plans.
