Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Irrigation Design topic

No spam. Unsubscribe anytime.

Board records irrigation design details; asks staff to verify slide-area engineering analysis expiration

Hidden Springs Sewer Company (HSTA) · June 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Minutes describe a modular, wirelessly controlled irrigation system for the new reclamation field and record an action to verify the expiration date of an engineering analysis for a nearby slide area before proceeding.

The June 25 minutes describe an irrigation design featuring modular sprinkler heads that can be individually controlled wirelessly so each zone can have any number of heads on or off. Staff recorded that a 6-inch line is stubbed to the back property line and the easement road at the end of Long Meadow and 14th Street and that the plan is to use existing on-site equipment for the new field.

The primary action item recorded in the minutes was to verify the expiration date on the engineering analysis for a slide area near the new irrigation field. The minutes do not provide the existing analysis date or the firm that prepared it; the board recorded the verification step as a prerequisite to work near that slope.