Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Pool Maintenance topic

No spam. Unsubscribe anytime.

Board records $9,612.50 PoolDr bid to replace South Meadow pool pumps

Hidden Springs Homeowners Association (HSTA) · June 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

An email vote on June 6 approved PoolDr's $9,612.50 bid to replace two pumps at the South Meadow pool with one larger pump and perform plumbing repairs; one pump was inoperable at the time of the report.

Minutes show the board approved by email on June 6, 2025 a $9,612.50 bid from PoolDr to replace two pumps at the South Meadow pool with a single larger pump and to complete plumbing repairs and system upgrades. The minutes state one of the two pumps was inoperable when the assessment was done.

The email vote outcome is recorded as approved 5-0. The minutes do not provide a contractor start date or a warranty or maintenance schedule for the new pump; the board listed pool infrastructure assessment and ongoing repairs as an agenda topic.