Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Planning Pud topic

No spam. Unsubscribe anytime.

Planning board recommends PUD for New Smyrna Beach Medical Complex with six stipulations

New Smyrna Beach Planning & Zoning Board · June 2, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning & Zoning Board voted 5–0 to recommend approval of PUD-4-22 (New Smyrna Beach Medical Complex and Wellness Center) contingent on six stipulations including enhanced stormwater compliance, defined substantial completion, maintenance provisions, restricted operating hours, and a no–light-spill photometric plan.

The New Smyrna Beach Planning & Zoning Board voted unanimously to recommend that the city commission approve PUD-4-22, a proposed New Smyrna Beach Medical Complex and Wellness Center, subject to six stipulations that the board recorded into the recommendation.

The motion, made by a board member and seconded by another, listed the stipulations: (1) design compliance with enhanced New Smyrna Beach stormwater standards; (2) a definition of substantial completion as 100% site work substantially completed and a 100% building shell substantially completed; (3) the applicant will pursue additional storage methods such as dry storage in the 75-foot setback to increase on-site retention; (4) long-term maintenance of stormwater infrastructure and improvements; (5) normal business hours for tenants to be Monday–Friday approximately 8 a.m.–5 p.m.; and (6) a photometric plan demonstrating no overflow lighting beyond the property lines.

An applicant representative told the board the project is intended as a family-practice/general-practice facility and explicitly said, “This is not a pain management clinic,” seeking to allay neighbor concerns about opioid-related services. The applicant also confirmed driveway access will be two-way and acknowledged that the preliminary plan includes four parking spaces, which the team said they will address through standard site-plan and engineering reviews.

The board recorded a roll-call vote; the clerk announced the tally as five in favor, zero opposed. The recommendation advances the application to the city commission for final action.

Provenance: topic introduced SEG 001; discussion and motion recorded SEG 332–666.