Summary
A proposed new home and lot combination at 854 Tijuana drew sustained neighbor opposition over lost Catalina and ocean views, privacy and potential safety/geotechnical issues; the board continued the item to Nov. 12 for revisions and further study.
Get email alerts on the Lot Combination Major Project topic
No spam. Unsubscribe anytime.
A substantial design and lot-combination application at 854 Tijuana Street prompted extensive public comment and detailed scrutiny from the Laguna Beach Design Review Board on July 22. The project proposes a new single-family home (~2,850 sq ft) plus an attached ADU (~950 sq ft), for a combined footprint of roughly 3,800 square feet, with about 890 square feet of elevated decks across two levels and associated lot-combination and road-extension considerations.
Neighbors testified at length that the proposal would substantially reduce ocean and Catalina Island views from nearby Balboa Avenue properties, create privacy intrusions from large glazed openings and expansive decks, and raise safety concerns relating to excavation and possible vibration on steep slopes. "The proposed design would eclipse the beautiful sunset views we have in the fall and in the winter," a neighbor said, describing how staking and story poles appeared to block much of the horizon and Catalina silhouette. Others raised questions about the proposed lot combination and whether the project would require a road extension and additional turnaround space subject to fire-code requirements.
Staff recommended continuing the application to allow the applicant to redesign and address view equity, privacy and lot-combination findings under the Archbeach Heights specific plan. Board members frequently asked for restaking with consistent story poles, additional graphics (overheads showing the line of development), and technical checks (hydrology, geotechnical and fire access) before any approval. The board moved to continue the item to November 12, 2026, to give the applicant time to revise drawings and consult with neighbors; the motion passed by roll call.