Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Playground Public Comment topic

No spam. Unsubscribe anytime.

Parents and teachers urge accessible replacement for elementary playground

Mosinee School District Board of Education · July 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

During public comment, a former student and a 4K teacher urged the board to prioritize replacement of the elementary playground and to select an accessible surfacing option (turf) so students with mobility limitations can participate.

Two public commenters used the district’s public comment period to press the board to prioritize a new, fully accessible elementary playground.

Jordan Baumann, introduced at the podium as a former student and parent of three, told trustees the current playground “has far exceeded the lifespan they were designed for” and asked the board to make replacement a priority rather than leaving it to piecemeal fundraising. “Safe functional facilities are not luxuries. They’re essential needs for our students,” Baumann said.

Heather Trakte, a 4K teacher who has served on the playground committee for two years, told the board the existing pea gravel surfacing is unsafe and limits access for students with mobility limitations; she asked trustees to prioritize turf or similarly accessible surfacing rather than wood chips. “I ask that you prioritize the fully accessible playground with surfacing such as turf,” Trakte said, noting that about a dozen students in the school have mobility limitations and that accessible surfacing supports inclusion.

Both speakers acknowledged the district’s budget constraints but said community fundraising should complement, not replace, a district commitment to safety and access. The board heard those concerns before later approving the $600,000 district commitment to the project.