Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Board authorizes guardrail installations at two village locations after engineer recommends action

Board of Trustees of the Village of Montebello · June 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Responding to past accidents and repeated complaints, the board authorized guardrail installations on Montebello Road (west of Hemion Road) and on Victory Road near the Mahwah River at a combined estimated cost of $12,977.50; NYS DOT told the board the work is a local responsibility.

The Village Engineer presented a recommendation to install or reinstall guardrails at two village locations that have experienced prior accidents and received numerous complaints: Montebello Road (west of Hemion Road) and Victory Road (south of Mayer Drive along the Mahwah River).

The engineer said NYS DOT indicated replacement is the village's responsibility. A Town of Ramapo contractor, Evolution Edges, provided a proposal of $7,160.00 for Montebello Road and $5,817.50 for Victory Road, for a combined cost of $12,977.50. The board authorized the Village Clerk‑Treasurer to coordinate with the engineer to arrange installation. Deputy Mayor Stacy Caridi moved the resolution and Trustee Bruce Egenhauser seconded; the motion carried with unanimous support of members present.

The minutes do not record a specific installation schedule or final contractor selection beyond the vendor proposal amount and the authorization to arrange the work.