Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Connection Fee Study topic

No spam. Unsubscribe anytime.

Village hires Ehlers to study sewer connection fees; attorney to draft ordinance

Village of Rockland Board of Trustees · June 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized Ehlers to perform a sewer system connection-fee study expected to take about 4–6 weeks and directed the village attorney to prepare a connection-fee ordinance.

Trustees on June 9 approved a contract with financial advisory firm Ehlers to conduct a sewer connection fee study for the Village of Rockland. The board recorded an estimated timeline of about four to six weeks to complete the study and asked the village attorney to prepare a draft ordinance to establish connection fees after the study is finished.

The motion to authorize Ehlers was moved by Trustee Seth Hemmersbach and seconded by Trustee Valerie Williams; the minutes state the motion carried. The study is intended to produce recommended connection fee schedules that would be codified in a local ordinance. No fee levels were included in the minutes; the ordinance and fee figures were noted as to be prepared after the study.