Board hears water-plant efficiency and communications upgrades; manager eyes Class B license

Palmyra Board of Public Works · July 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Manager Dustin Smith described dehumidifier adjustments, a $24,000 closed-loop option, a newly installed effluent meter, a VFD at Well 7, possible fiber-optic communications and his plan to pursue a Class B wastewater license (nine-day class in Macon in August).

Water/Wastewater Manager Dustin Smith told the board the water plant's dehumidifier has been adjusted to pull less water per minute and said staff are considering adding a closed-loop system to reduce water use further; Smith estimated the closed-loop would cost about $24,000. The board recorded the estimate and did not take a purchase vote at the meeting.

Smith also reported that a new effluent meter has been installed at the water plant, a variable frequency drive (VFD) has been installed at Well 7 and communication equipment for the well has been relocated. He said the board discussed the possibility of running fiber-optic communications to the wells during the planned raw water line upgrade. Smith added he is considering pursuing a Class B license for the wastewater plant and would need to attend a nine-day class in Macon in August; the board scheduled a water plant tour at the first meeting in September.