Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

DOT offers 2031 resurfacing; Bloomington to televise sewer and check for lead lines before deciding

Village of Bloomington Board · December 1, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Wisconsin DOT told the village it must decide by March 1, 2026 whether to replace utilities during the 2031 Highway 35 resurfacing; Delta 3 recommended televising sanitary sewer and doing basement inspections to locate lead water services; board directed staff to request bids and televising before January.

The Wisconsin Department of Transportation notified the Village of Bloomington about a Highway 35 resurfacing project scheduled for 2031 and asked whether the village wants to replace its utilities along with the work. The DOT requested a decision by March 1, 2026.

Mark Digman of Delta 3 Engineering recommended televising the sanitary sewer to assess condition and conducting basement inspections to identify any lead water service lines before the village decides whether to include utility replacement in the DOT project. Director of Public Works Keith Leitzinger reported finding lead water service lines during recent inspections and the board directed him to contact Digman to arrange sewer televising and solicit bids before the January meeting.