Summary
Utility staff installed new equipment at the east lift station, assisted KMEA with pole replacements, insulated meter pits against freezing, repaired a sewer line at 518 S. Huston, and prepared vehicles and equipment for winter storm 'Fern'.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Utility department staff reported a series of maintenance and emergency-preparedness actions. Crews installed a new solenoid valve and a replacement vacuum pump motor at the east lift station, ordered a replacement motor from Smith & Loveless, and repaired a sewer line at 518 S. Huston.
Staff also assisted KMEA with replacing three 3-phase electric poles and one single-phase pole, restocked the bucket truck, moved the new trash truck into heated storage, replaced plow lighting, and installed insulation in meter pits known to freeze. These steps were recorded as part of the city’s preparations for the cold spell known as winter storm "Fern."
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.