Altamont utility department reports repairs, new service installs and staff training
Summary
Utility staff reported temporary repairs at the East lift station, installation of a new gas service (~250') and a new water meter set (~260'), tree trimming over utility lines, brush pickup at Idle Hour Lake, and staff training for line-locating and bucket-truck work.
Get email alerts on the Infrastructure topic
No spam. Unsubscribe anytime.
Utility staff reported maintenance and installation activity including temporary repairs on the East lift station with parts ordered from Smith and Loveless, installation of a new gas service approximately 250 feet at 7th and Lincoln, and installation of a new water service meter set approximately 260 feet (noted as tied in on 01/06/2026). The department also reported trimming trees on Wells Avenue above secondary and high-voltage lines and brush removal at Idle Hour Lake.
The minutes note on-the-job training: Joe Nativi was trained to use the line locator and gained experience cutting trees from a bucket truck; Dakota Pousher was singled out as doing a good job. The minutes include a department remark: "I am proud of the Utility Department!" as part of the report.