Applicant says safety, parking and stormwater concerns were reviewed; offers mitigation and signage

Exeter Zoning Board of Adjustment · July 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Applicant representatives told the board they had met with technical review, provided a drainage study, and would provide two off-street parking spaces per unit; they agreed to consider signage and other mitigations requested by neighbors.

Project engineer Corey Belden and applicant counsel told the Zoning Board the proposal had been through technical review and that police and fire expressed no substantive safety concerns. Belden said the team had submitted a full drainage study and that stormwater management has been designed to meet post-development runoff standards.

Belden said the street is a low-speed dead end and that he does not "personally see the safety concern" for the additional, limited driveways, but he also said the applicant is open to addressing safety concerns and signage during site-plan review. "We did not have any concerns" from police or fire at technical review, Belden said, and the applicant confirmed it will provide two parking spaces per unit rather than the one required by statute.

The board's approval explicitly asks planning/technical review to examine the impact of snow accumulation on the street and on-street parking, and to recommend signage (for example: "Dead end '1 No access to Academy") if appropriate. The board stressed that granular issues such as snow storage, tree retention and exact driveway placement would be handled in planning and site-plan review.