Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lake 8 Drainage topic

No spam. Unsubscribe anytime.

Residents urge Lake 8 drainage fixes after damage to home floors; engineer recommends Seaside-style regrading

River Ridge Community Development District · January 28, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Oak Run residents reported slow-receding rainwater near Lake 8 and at least one homeowner reported floor flooding costs; District Engineer Charlie Krebs recommended regrading similar to recent Seaside work and the board said the issue will be considered during the FY 2025/2026 budget process.

Rich Batterberry, identified in the minutes as a resident and NVR of Oak Run, told the board that Oak Run residents "are asking the Board to consider something similar to their neighborhood, as it takes a long time for the rainwater that pools from the monument to halfway down Lake 8 to recede." He said one resident incurred significant repair costs to mitigate water coming up through the floor.

District Engineer Charlie Krebs reviewed the scope of the Seaside work and said the Lake 8 issue could be addressed by completing similar regrading work; Chair Bob Schultz said the matter will be considered during the Fiscal Year 2025/2026 budget process. Staff did not provide a cost estimate at the meeting; Mr. Krebs said he would obtain costs for replanting littorals at a separate location and will include stormwater-related items in the upcoming forecast.