Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Maintenance Operations topic
No spam. Unsubscribe anytime.
Tamworth Fire reports valve handle replacement, air horn repair lead, sink shutoff and new apparatus checklists
Summary
Chief Colcord obtained a replacement handle for 6E1's gated relief valve; M. Baumann traced 6E1's air horn problem to a solenoid valve; Chairman Bowles shut off a leaking industrial sink and Capt. D. Costello began apparatus checklists.
Get email alerts on the Maintenance Operations topic
No spam. Unsubscribe anytime.
Chief R. Colcord told the Board he obtained a replacement handle for the incoming gated relief valve on apparatus 6E1. Fireward M. Baumann reported he traced the air horn issue on 6E1 to a solenoid valve and showed the chief where the component is located after the meeting.
Chairman Jim Bowles said he shut off the water to the industrial sink in the back of Central Station because the unit was dripping rapidly and likely needs a new washer or replacement. Separately, Capt. D. Costello has started developing apparatus checklists to support routine maintenance and inspections.
