Survey complete for Perry Park fire pond; board moves project toward preliminary design
Summary
The board was told the fire pond survey is complete and the district will move into preliminary design; the 811 registration will need to cover dry hydrant installation once design is finalized.
Get email alerts on the Fire Pond Design topic
No spam. Unsubscribe anytime.
Director Keith A. Worley reported that surveying for the district's proposed fire pond is complete and that the project will move into preliminary design. Worley said he will meet with the engineer in the field to review the design and then pursue conversations with potential funding partners.
Board members noted that once design work is complete, the District's registration with the 811 notification system will need to encompass the planned dry hydrant installation. District staff will pursue design and funding next steps and report back at a future meeting.