Council chose Orbis Environmental Consulting for $2,105 to perform the National Historic Preservation study required by the EPA as part of the Village's water-project grant work; Merritt Engineering continues work on the first grant and a new pump has been installed.
Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
Mike Mumper updated the Council that Merritt Engineering continues to move forward on the first water grant and that the project plan must include a National Historic Preservation study required by the EPA. The Council reviewed two consultant quotes for that study — Merjent at $7,450 and Orbis Environmental Consulting at $2,105 — and approved Orbis for $2,105.
Mumper reported that a new 750mp pump has been installed as part of the first grant work and said he hopes a water contract with Grand Beach will be ready by the April meeting. The second water grant had to be resubmitted because Congress placed a pause on grant awards; the National Historic Preservation study will cover both the first and second grant applications as described in the project plan.