Board reviews grounds work, pond encroachment and irrigation repairs at Heritage Pines
Summary
Supervisors reported park and front-property work, agreed to twice-annual mulching starting in October, and tasked staff to monitor potential homeowner encroachment at Pond 16 and to seek proposals for algae treatment on multiple ponds.
Get email alerts on the Maintenance topic
No spam. Unsubscribe anytime.
Supervisors and staff reviewed recent operations activity, including park upkeep, a planned bench installation, and concerns about construction encroaching on a retention/EDRA area near Pond 16.
Assistant Secretary Carol Vaughan said the front property and Paleo Park are in good condition and requested another bench; Grounds Superintendent Tim Gatz will meet with her to determine placement. Supervisor Michael Walsh reported that a homeowner-installed pool and cage near Pond 16 appear to be encroaching on the EDRA and that the bank sustained damage; staff will monitor and address the matter with the homeowner after work is complete.
Mr. Adams and Mr. Hurley also discussed algae observed in Ponds 7, 5 and 11; Adams will request a proposal from a contractor with local experience treating irrigation holding ponds. Separately, Ms. Lonergan noted a temporary dam was built on Hole 11 to address an irrigation break.
The board recorded a to-do list: sign repair (painting remaining), twice-annual mulching of the park starting October 2024, contractor follow-up to remove trees small enough to present hazards, and staff outreach to a resident planting trees in a retention area.