CIP list reviewed: generator, siren relocation, tank upgrades and Cheyenne Boulevard design on radar

Box Elder City Council · October 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Staff walked the council through a slate of CIP projects (city hall generator, emergency siren relocation in coordination with county, tank liner and piping work, and Cheyenne Boulevard design); several projects rely on FEMA, SRF or loan financing and some costs may roll into 2026.

Renee and department leads reviewed planned capital projects including a city hall generator (FEMA covers partial cost but city carries ~$10,000), replacement/relocation of an emergency siren coordinated with the county, tank liner and pipeline upgrades identified in the EPA sanitary survey, and ongoing SRF‑funded work on Cheyenne Westgate and Tank 4. Engineering noted tank piping and well/tank connections as priorities tied to distribution and water temperature performance.

Cheyenne Boulevard design is roughly 40% complete; staff discussed a potential approach to contract for design and have the county reimburse the city, and noted the need to plan for a large balloon payment on a district loan in 2029 with refinancing options being examined. Several park projects tied to BID 1 funding (pavilion, paving, irrigation) were also presented.