Subdivision of 70 Orangeburg Road carried after board flags major drainage concerns

Borough of Old Tappan Planning/Board of Adjustment (meeting transcript) · January 13, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A proposed minor subdivision of 70 Orangeburg Road into two lots prompted extensive discussion about long‑standing drainage and flooding on adjacent streets; the board asked the applicant’s engineers to return with stormwater mitigation and carried the hearing to Feb. 12 without further notice.

The planning board carried the subdivision application for 70 Orangeburg Road after members and board professionals said existing drainage problems required further analysis and mitigation.

Applicant counsel introduced testimony and technical exhibits for a plan to split a roughly 50,415‑sq‑ft parcel into two lots (proposed Lot 8.01 ~27,280 sq ft; Lot 8.02 ~23,134.5 sq ft). Engineer Mark Martins and the applicant’s planner described the proposed lot lines and noted that some existing nonconforming elements (detached garage size, front setback) would remain unchanged; the proposed new lot would likely require improved‑lot‑coverage and floor‑area‑ratio variances.

Board members and the planning consultant raised detailed stormwater concerns. Reading a recent memo into the record, a board member said, “There is an existing drainage issue from the existing driveway and other improvements on Lot 8.01 that affects homes on Perry Street,” and described a large upstream tributary area that may include part of the Orangeburg Road right of way. The planner and engineers discussed possible solutions (piping to a southerly easement, multiple seepage beds, grading adjustments at the driveway apron) and concluded the issue was substantial enough that the applicant should return with targeted stormwater revisions.

The board agreed to carry the hearing to February 12 at 7 p.m. so the applicant can submit revised plans addressing drainage and the remaining variance criteria; members said adequately addressing stormwater would strengthen the applicant’s case on negative‑criteria impacts.