At the meeting a Selectman reported that the Sun Life project contractor asked for permission to install two catch basins on a town-owned line, to reconfigure some parking to parallel spaces and to repair the town clock tower, and the board tentatively approved moving forward.

During public input, a Selectman said Jim Nava, the contractor engineer for the Sun Life project, attended a related meeting and requested the town's permission to install two catch basins into an existing line that is partly town-owned. The contractor also proposed building a parking lot that converts angled parking to parallel spaces and adding handicapped spots; the Selectman said the clock tower would be repaired and reconnected to computerized controls.

Board members characterized the proposed changes as generally positive and reported tentative approval at another local meeting with a recommendation to preserve the clock tower. The item was presented as public input; board members expressed support and recommended coordination with town staff on details and permitting.

No formal vote on permits or easements was recorded at this meeting; the board advised staff to follow up as needed.