Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facility Condition topic

No spam. Unsubscribe anytime.

Bucks Hill staff detail leaks, foundation concerns and limited adaptive space during board tour

Waterbury Board of Education · July 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Touring officials saw occupational-therapy and sensory spaces and heard staff say portables need ongoing repairs (patching leaks, sealing gaps, replacing doors, reinforcing foundations) to remain safe while a permanent preschool is planned.

District staff led board members through Bucks Hill and highlighted specific maintenance needs they say require attention if portables remain in use while a new building is planned.

Superintendent Darren Swartz and staff listed required repairs: patching recurring roof leaks, adding screens to windows, replacing worn exterior doors, replacing ceiling tiles, sealing exterior gaps and reinforcing the foundation. Swartz said reinforcing the foundation would likely be one of the biggest near-term costs to ensure nothing is getting underneath the current structures.

Staff described inside conditions that constrain programming—limited storage, narrow hallways used for recess during long winter months, and sensory spaces that are small and frequently require one-on-one staffing. They noted the playground lacks adaptive play equipment and said an "inclusion buggy" donated by a community member helps non-ambulatory students participate in outdoor time.

Staff framed many of these measures as interim: the team favors targeted, strategic repairs to keep Bucks Hill safe and functional while the district completes planning for a permanent facility.